Build Day 22
I spent most of the morning trying to find some where to sell me the plastic sheeting that I needed to finish the bathroom. After quite a lot of phoning etc, I found a supplier and managed to pick up the sheets. By the time all this was sorted most the morning had gone, which was a shame but we ploughed on.
We cut an fitted the plastic sheeting on the the van wall, then glued down the lino, and started to fix all the plastic tracking in place. This final fit of the track that the walls will sit in, requires the final triming and shaping of the wood which takes a while. By the end of the day all the tracking was done, and I'd fitted the all walls in to check every thing worked, however we then removed the walls as there would not be time to fix them in-place correctly before I had to drive the van back home.
Information and Links
Join the fray by commenting, tracking what others have to say, or linking to it from your blog.



